During a recent project, SoluForce was able to deliver and install 1,600 meters of flexible composite pipeline within 2 weeks of receiving the order. A speed and efficiency unmatched by any of our competitors. This enabled our customer to be back and operational in no time.
The customers experienced catastrophic downtime in their offshore operation and needed a quick and reliable solution to ensure production could be up and running as soon as possible. Naturally they turned to SoluForce.
To ensure fast delivery, a cargo plane was arranged that could transport all the coils, within a week of placing the order. With preparations done on shore, the only thing that needed to be done was sail to the production site, uncoil the SoluForce pipe and connect it to existing infrastructure.
Do you have questions? Contact us via contact form or chat! Our experts will get in touch with you as soon as possible