An Inter-field Connection with Low CAPEX and no OPEX

A French oil company was looking for a straightforward, reliable, cost-effective and easy-to-deploy solution to connect two of its fields off the coast of west Africa. Naturally they turned to SoluForce for the ultimate solution...

SoluForce Flexible Composite Pipe (FCP) systems are ideal for anyone who wants to minimise CAPEX and eliminate OPEX. For this particular project, 8.8 km of SoluForce Classic was laid in less than two days (at an average speed of 5.5 km a day) and only one deployment carousel was needed. It was assembled onshore, locally, and stabilised on the seabed, 40 metres down, using locally made concrete blocks.

The capital costs were extremely low compared to the alternatives, and because all SoluForce FCP are corrosion free, operational costs were eliminated...

Facts

  • Product: SoluForce Classic M570
  • Length: 8.8 KM
  • Total offshore time: Only 2 days
  • Seabed stabilization: Locally produced concrete blocks
SoluForce Offshore case 1 3

SoluForce Videos

Check out our Youtube channel.

Contact us

Do you have questions? Contact us via contact form or chat! Our experts will get in touch with you as soon as possible

*  Mandatory fields

Your data will be treated as confidential. Your consent can be withdrawn at any time by sending an email to info@soluforce.com in which you clearly state that you wish to withdraw your consent. The lawfulness of the processing of your data prior to your withdrawal of consent remains unaffected. For all details regarding the storage, processing and deletion of data as well as your rights regarding the use of your personal data, please refer to our Privacy Policy.

Downloads

Advanced flexible pipeline systems for oil, gas and water

Download Center
Did you not find what you are looking for?

Frequently asked questions

Find answers to the most common questions here: